It's exactly the same. You're adding one 30-50A circuit to residential that will be used intermittently, and primarily during off peak hours. Very, very few vehicles will need a full charge every night, and the software on the charger side typically meters in current at much less than capacity if it's on a schedule, as the lower the current, the less heat, and less stress on the battery . Large charging stations are on par with commercial/light industrial, and we add that sort of load all the time.

I've worked for power utilities for 25 years on the generation side with some on the T&D side. The planners spend a pile of time on analysis to determine where additional load and/or sources are being added and triage based on that. When old stuff is scheduled for replacement, sometimes an upgrade is warranted, sometimes not, based on that analysis.

A lot of electrical equipment currently has long lead times. I've got quotes for up to 70 weeks on some stuff. It's been a side effect of relying on dodgy suppliers overseas. It has been improving.

this post was submitted on 17 Sep 2023
354 points (99.2% liked)

Canada

7307 readers
1076 users here now

What's going on Canada?



Related Communities


🍁 Meta


🗺️ Provinces / Territories


🏙️ Cities / Local Communities

Sorted alphabetically by city name.


🏒 SportsHockey

Football (NFL): incomplete

Football (CFL): incomplete

Baseball

Basketball

Soccer


💻 Schools / Universities

Sorted by province, then by total full-time enrolment.


💵 Finance, Shopping, Sales


🗣️ Politics


🍁 Social / Culture


Rules

  1. Keep the original title when submitting an article. You can put your own commentary in the body of the post or in the comment section.

Reminder that the rules for lemmy.ca also apply here. See the sidebar on the homepage: lemmy.ca


founded 4 years ago
MODERATORS