910
submitted 4 months ago by vegeta@lemmy.world to c/technology@lemmy.world
you are viewing a single comment's thread
view the rest of the comments
[-] atomicorange@lemmy.world 11 points 4 months ago

Hmm, space is a little different because so many products are one-offs. It’s hard to design checklists and detailed procedures when you’re making what are essentially prototypes each time. So you make more general processes and then your engineers apply them as needed to each unique build. It can end up looking like a bit of a mess. Space builds rely a lot on expert techs, good modular documentation, and multiple layers of engineering oversight because things change along the way and you can’t always plan for it.

I’m a process engineer at a different aerospace company. I standardize as much as I can and work hard to make instructions clear but man it’s a struggle. Boeing’s space group needs to pay people enough to retain good talent, because they’re all making decisions all day long.

this post was submitted on 09 Aug 2024
910 points (99.5% liked)

Technology

60130 readers
2790 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 2 years ago
MODERATORS